Retain raw durations
Owner role · Report owner
Evidence: All three 0.6 hour values remain available.
Reporting decisions / Delivery leads and report reviewers
Drafting workbenchCompare rounding each duration with rounding the total before publishing a work-time summary.
The example resolves accumulation of rounding differences, distinct from converting mixed units or choosing a display format.
Opens the current invite-request page. Access is subject to approval; this example is not imported automatically.
Synthetic case: Three elapsed durations are 0.6 hours each. The draft rounds each to a whole hour and then adds them.
Owner role · Report owner
Evidence: All three 0.6 hour values remain available.
Owner role · Reviewer
Evidence: The policy sums raw values before rounding once to whole hours.
Owner role · Lead
Evidence: 1.8 raw hours becomes 2 display hours; per-item rounding would be 3.
Decision to make: Under the stated sum-raw-then-round policy, retain 1.8 raw hours and show 2 whole hours; disclose that rounding each first would show 3.
Use the downloaded brief as planning input. AI suggestions remain proposals; review scope, owners and acceptance evidence yourself.
Invented planning text. Adapt it to your evidence and confirmed owners.
Precision note: raw total 1.8 hours; displayed total 2 hours under sum-then-round. A different order yields 3 and is not silently substituted.
From a useful outline to team work
Bring this manual reporting policy and its owned checks into your TeamBoostAI work discussion. Native report/export fields and historical reconstruction depend on your account and implementation; this worksheet does not import or change product records. Confirm the workflows available in your account before adopting this outline.
Opens the current invite-request page. Access is subject to approval; this example is not imported automatically.
A practical decision workshop
Trace an invented case, preserve the evidence limits, then adapt the manual worksheet to your own decision.
Version comparison viewer
Draft: three whole hours after rounding each item first.
Precision note: raw total 1.8 hours; displayed total 2 hours under sum-then-round. A different order yields 3 and is not silently substituted.
| Review boundary | Draft to review | Revised example |
|---|---|---|
| Rounding order | Round each then add | Add raw then round once |
| Evidence | Only rounded values retained | Raw durations retained with policy |
Wide tables scroll sideways on small screens.
Synthetic example · not customer data
| Item | Raw elapsed hours | Per-item rounded display |
|---|---|---|
| A | 0.6 | 1 if rounded first |
| B | 0.6 | 1 if rounded first |
| C | 0.6 | 1 if rounded first |
Wide tables scroll sideways on small screens.
Download records (.csv) · Download complete decision kit (.json)
Decision explorer
This returns a written example explanation. It does not inspect your records or approve a real report.
Rounding each 0.6 to 1 before summing gives 3; summing first gives 1.8 and then 2.
No. Keep original event evidence and raw values.
No. The brief is a manual planning resource. Use the product access link to check onboarding and the workflows available in your account.