Shared input
- Required input
- Required by both routes
- Receiving condition
- Inspect upstream availability
Risk and options / Delivery leads, planning owners and acceptance reviewers
Dependency mapAvoid treating two routes with one common dependency as independent backups.
The worked case tests common-cause failure in an either-route plan, distinct from serial gates requiring both successes.
Opens the current invite-request page. Access is subject to approval; this example is not imported automatically.
Original worked case · Manual planning resource
Start with the invented evidence, follow the reasoning, and retain its limits when adapting the brief.
01 · Inspect the inputs
| Toy condition | Probability | Route A | Route B |
|---|---|---|---|
| Shared input missing | 0.1 | Fails | Fails |
| Shared input available | 0.9 | Succeeds | Succeeds |
Use horizontal scrolling for wide tables. These records are invented, not customer data.
02 · Follow the reasoning
The only joint failure event is the shared missing input, with supplied probability 0.1. The false independent calculation 0.1×0.1=0.01 describes a different model. Naming two routes does not create independent redundancy.
Both routes fail together with probability 0.1 under the declared common-input model. Squaring 0.1 to obtain 0.01 would assume away the shared dependency.
Records, decisions and policies are original synthetic examples. External references supply context; they do not validate these cases or TeamBoostAI capabilities.
Original worked-case definitions
Definitions, policy choices, records and calculations are authored for this worksheet. No external standard, statistical validation or live product measurement is claimed.
External references checked 6 October 2026. Demand for these topics has not been measured.
Synthetic planning case: Two alternate delivery routes use the same required input. In an invented model that input is missing with probability 0.1; both routes otherwise succeed. A proposal treats the routes as independent backups.
Decision to make: Both routes fail together with probability 0.1 under the declared common-input model. Squaring 0.1 to obtain 0.01 would assume away the shared dependency.
Owner role · Route planner
Evidence: Both routes depend on the same named input.
Owner role · Reviewer
Evidence: The two supplied rows describe all events in the toy model.
Owner role · Delivery lead
Evidence: Any alternative intended to bypass the input has its own verified requirements rather than a second route name.
Invented planning text. Adapt it to your evidence and confirmed owners.
Both routes fail together with probability 0.1 under the declared common-input model. Squaring 0.1 to obtain 0.01 would assume away the shared dependency. The only joint failure event is the shared missing input, with supplied probability 0.1. The false independent calculation 0.1×0.1=0.01 describes a different model. Naming two routes does not create independent redundancy. Other failures are excluded by the toy definition. This does not estimate operational reliability or establish a real backup route.
Not if that executor still needs the same absent input.
No. It is a supplied illustrative probability with deliberately simplified conditions.
No. The brief is a manual planning resource. Use the product access link to check onboarding and the workflows available in your account.
From a useful outline to team work
Use the owned checks and downloaded brief to discuss this planning decision alongside your TeamBoostAI tasks. Confirm available fields, roles and account features separately. The example is manual; it does not calculate live analytics, create work or run an experiment in the product. Confirm the workflows available in your account before adopting this outline.
Opens the current invite-request page. Access is subject to approval; this example is not imported automatically.